---
title: Move from Tally to Mach ERP
description: We read your Tally and spreadsheet data and validate it before go-live. For manufacturing plants from about ₹ 50 crore to ₹ 500 crore that still run on Tally.
url: "https://www.macherp.in/migrate-from-tally"
---
For Tally users

# 

Mach ERP reads Tally item master and day book exports. Items it is unsure about wait for a person. Nothing is guessed, and nothing you typed in Tally is typed again.

[Book a demo](https://www.macherp.in/contact)[WhatsApp](https://wa.me/919205687326?text=Hello%2C%20I%20use%20Tally%20and%20want%20to%20see%20my%20data%20in%20Mach%20ERP.)

app.macherp.in/import/tally

Tally export · Harbour Tools

Item master, day book, ledgers

**3 of 4** rows clear

In TallyIn Mach ERPStatus

Stock items · 1,2481,248 items mappedChecked

Ledgers and parties · 312312 ledgers, GSTINs matchedChecked

EN-8 shaft 40x620EN8 shaft 40 × 620 mmMerged

Coolant ?No unit, no rate. Not guessed.Waits for a person

Dummy data. Harbour Tools.

Today

## 

Orders sit in one spreadsheet, stock in another, job status in WhatsApp. They meet in Tally once a month. When the MD asks for one number, someone spends two days stitching it together.

Where the plant lives today

* Problem: Orders in Orders\_June (2).xlsx
* Problem: Stock in RM stock FINAL v3.xlsx
* Problem: Job status in a WhatsApp group
* Problem: Books in Tally, matched to the rest once a month
* Problem: Two days of stitching for one number the MD asked for

In Mach ERP

* The modules share one ledger.
* Each document in the order flow links to the one before it.
* Your Tally masters and day book come with you. You do not start from an empty system.

What moves

## 

Mach ERP reads Tally item master and day book exports. Excel and CSV files come in the same way. The same item typed two ways becomes one item. A row with no unit or rate is not filled in for you. Hover or tap an export to see where it lands.

* Stock item master — links to Items, one per part, Waits for a person
* Ledger masters — links to Customers and vendors, GSTIN on each party, Ledger accounts
* Day book — links to Ledger accounts, Waits for a person
* Excel or CSV item list — links to Items, one per part, Waits for a person
* Items, one per part — links to Stock item master, Excel or CSV item list
* Customers and vendors — links to Ledger masters
* GSTIN on each party — links to Ledger masters
* Ledger accounts — links to Ledger masters, Day book
* Waits for a person — links to Stock item master, Day book, Excel or CSV item list

How it is checked

## 

Migration works in three layers: rules, matching and a language model. Items it is unsure about wait for a person.

Moving the data is the second of six phases, before anyone is trained on the new screens. A typical go-live takes 4 to 8 weeks, depending on the modules and the data. [See the six phases](https://www.macherp.in/implementation)

1. 01  
### Rules  
Every row is checked against fixed rules first.  
312 ledgersGSTINs matched
2. 02  
### Matching  
Then matching looks for the same item typed two ways.  
EN-8 shaft 40x620Merged with EN8 shaft 40 × 620 mm
3. 03  
### Language model  
A language model reads what rules and matching could not place.  
Brt bar 40 diaPlaced as EN8 bar Ø40
4. 04  
### A person decides  
Items it is unsure about wait for a person.  
Coolant ?No unit, no rate. Waits for a person

Dummy data. Harbour Tools.

Questions

## 

### How does my Tally data move in?

We read your Tally and spreadsheet data. It is validated before go-live.

### Which Tally data does Mach ERP read?

Mach ERP reads Tally item master and day book exports.

### Our Tally data is messy. Is that a problem?

Migration works in three layers: rules, matching and a language model. Items it is unsure about wait for a person.

### Can I bring Excel files?

Yes. We read your spreadsheet data, including Excel and CSV files.

### What do I need to start?

Bring a Tally export or an item list. We will show you what it looks like in Mach ERP.

### How long does a go-live take?

A typical go-live takes 4 to 8 weeks, depending on the modules and the data. Moving the Tally data is one of the six phases, not a separate project.

### Where will my data live?

Your dedicated instance runs on AWS in Mumbai (ap-south-1). Your data stays in India. It is on your cloud, not a shared system. You pay that bill. We manage the instance if you want.

Bring a Tally export

Bring a Tally export or an item list. We will show you what it looks like in Mach ERP. [Mach ERP and Tally or Excel](https://www.macherp.in/vs-tally-and-excel)

[Book a demo](https://www.macherp.in/contact)[WhatsApp](https://wa.me/919205687326?text=Hello%2C%20I%20use%20Tally%20and%20want%20to%20see%20my%20data%20in%20Mach%20ERP.)

Publisher: ATTAINMACH33 LLP
LLPIN: ACX-7112
GSTIN: 06ACOFA1573G1ZE
Address: 630 Tower 4, RPS 12th Avenue, 2/6 Milestone, Main Mathura Rd, Faridabad, Haryana 121003
Email: contact@mach33.in
Phones: +91 85957 46459, +91 92056 87326
Facts: https://www.macherp.in/agents
