---
title: Stock is a spreadsheet
description: "Stock is a spreadsheet. The dock is a queue. Materials in Mach ERP holds purchase, GRN, bins and heat numbers on the same record as quality."
url: "https://www.macherp.in/modules/materials"
---
[Modules](https://www.macherp.in/#s6) Materials

Materials

# 

A purchase order becomes a GRN. Stock sits in bins that production issues from and finance values. The heat number stays on the record.

[Book a demo](https://www.macherp.in/contact)[WhatsApp](https://wa.me/919205687326?text=Hello%2C%20I%20want%20to%20see%20the%20Materials%20module%20of%20Mach%20ERP.)

Multi-plant stock

## 

Run more than one plant in one system, and move stock between plants with the transfer recorded.

Stores and quality read the same GRN. Finance values the same stock.

Harbour Tools · one stock record

Plant 1

* RM-01EN8 bar Ø407 bars
* QC holdHeat H-00071 held
* RM-02
* RM-03
* FG-01
* FG-02

TR-0007 · 4 bars

Plant 2

* RM-01EN8 bar Ø404 bars
* RM-02
* RM-03
* FG-01
* FG-02
* FG-03

Movements on the record

* GRN-0007Plant 1 · RM-01 · 11 of 12 accepted+11
* QI-0007Plant 1 · QC hold · heat H-00071 held
* TR-0007Plant 1 to Plant 2 · RM-014

Dummy data. Harbour Tools.

Today

## 

The store sheet was last updated on Friday. Production asks for bars, and someone walks to the rack to count. The heat number for the lot is in a notebook nobody can find.

With Mach ERP Materials

* A purchase order becomes a goods receipt. The GRN is the record stores and quality both read.
* The GRN records the heat number against the stock.
* Run more than one plant in one system, and move stock between plants with the transfer recorded.

Dummy data. Harbour Tools.

Covers

## 

* Purchase
* Stores
* GRN
* Stock
* Bins
* The GRN records the heat number against the stock.
* Run more than one plant in one system, and move stock between plants with the transfer recorded.
* A photo of a bill or a GRN can become the entry. You do not type the same paper twice.
* The dock, the floor and the store can work from a phone. They do not wait for a desk.

Works with

[ProductionThe job shipped. You still do not know what it cost.](https://www.macherp.in/modules/production)[QualityThe bad lot is already in the machine.](https://www.macherp.in/modules/quality)[FinanceMonth-end is when you find the leak.](https://www.macherp.in/modules/finance)

Questions

## 

### Does quality see the same GRN as stores?

Yes. The GRN is the record stores and quality both read. A GRN opens an inspection, and items that fail stay out of stock.

### How does material reach a job?

Production issues from the bins, against the bill of material for that job.

### Is stock valued separately by accounts?

No. Finance values the same stock that sits in the bins. There is not a second stock figure.

### We have more than one plant. Does that work?

Yes. Run more than one plant in one system, and move stock between plants with the transfer recorded.

![Mach ERP open on a laptop and a phone](https://www.macherp.in/images/devices-meadow.webp)

From the dock

## 

The dock, the floor and the store can work from a phone. They do not wait for a desk.

[Book a demo](https://www.macherp.in/contact)[WhatsApp](https://wa.me/919205687326?text=Hello%2C%20I%20want%20to%20see%20the%20Materials%20module%20of%20Mach%20ERP.)

Publisher: ATTAINMACH33 LLP
LLPIN: ACX-7112
GSTIN: 06ACOFA1573G1ZE
Address: 630 Tower 4, RPS 12th Avenue, 2/6 Milestone, Main Mathura Rd, Faridabad, Haryana 121003
Email: contact@mach33.in
Phones: +91 85957 46459, +91 92056 87326
Facts: https://www.macherp.in/agents
