Skip to main content
Modules Quality

Quality

Incoming goods are inspected before they enter stock. Inspection points also sit in the production flow, on the same job as the production order.

Today

The lot came in at 3 pm. The QC slip is paper, filled in the next morning. By then the cracked bar has gone to the machine.

The status quo

  • Problem: The QC slip is paper, filled in the next morning
  • Problem: The heat certificate is checked by hand, if at all
  • Problem: A cracked bar reaches CNC-02 before anyone flags it
  • Problem: The rejection note goes out a day late

With Mach ERP Quality

  • A GRN opens an inspection. Items that fail stay out of stock.
  • Incoming goods are inspected before they enter stock.
  • Inspection points sit in the production flow, on the same job as the production order.

How it runs

Inspect at receipt

The GRN opens the inspection. Goods are checked at the dock, before they are counted as stock.

Hold what fails

Items that fail stay out of stock, so production cannot issue them to a job.

Inspect in process

Inspection points sit in the production flow, on the same job as the production order.

Questions

The GRN. A GRN opens an inspection, and items that fail stay out of stock.

Yes. Inspection points sit in the production flow, on the same job as the production order.

Items that fail stay out of stock. Production issues from stock, so a failed item is not issued to the job.

Covers

  • Inspections at receipt
  • Inspections in process
  • A GRN opens an inspection. Items that fail stay out of stock.

Quality

Bring a Tally export or an item list. We will show you what it looks like in Mach ERP.
Agent view shows this page as plain markdown, the format that AI systems can request.I’m a humanI’m an AI agent