Engineered products
- PRO-0007₹13,000
- Job cost so far, posted as each operation completed.
- GRN-000711 of 12
- Bars passed inspection. One held out of stock.
- INV-0007₹4,60,200
- ₹3,90,000 plus IGST ₹70,200, from the same order.
Northgate Engineering · 12 × EN8 shaft 40 × 620 mm
Dummy data. Harbour Tools.
One order through the plant
- The bill of material lists what the job needs. The production order is linked to the sales order that asked for it.
- PRO-0007
- SO-0007
- Production cost posts to the ledger as each operation completes.
- Turning ₹6,000
- Grinding ₹4,500
- Inspection ₹2,500
Bring one job you shipped last month. We will run it through Mach ERP with you.
Dummy data. Harbour Tools.
What we hear
Quote to order
The rate changed in a chat. The order was typed twice.
SO-0007 Linked to QTN-0007Northgate Engineering · 12 × EN8 shaft
Rate₹32,500Delivery by12 NovOrder value₹3,90,000Shop floor
The job shipped. You still do not know what it cost.
Turning time, grinding time and scrap are written down somewhere on the floor. Someone works out what the job cost after it has shipped, if anyone does.PRO-0007 Cost posted12 × EN8 shaft for SO-0007
Turning · CNC-02₹6,000Grinding · GR-01₹4,500Final inspection₹2,500Job cost so far₹13,000Incoming material
The bad lot is already in the machine.
GRN-0007 Inspected12 × EN8 bar · heat H-0007
Passed to RM-0111 barsHeld, out of stock1 barHeat on the stockH-0007
The modules
Engineered products: the same Mach ERP every plant runs.
Yes. A production order is the job on the shop floor, linked to the sales order that asked for it.
Production cost posts to the ledger as each operation completes, not at month-end.
Run more than one plant in one system, and move stock between plants with the transfer recorded.
Mach ERP reads Tally item master and day book exports.
We read your Tally and spreadsheet data and validate it before go-live.
Yes. E-invoicing, e-way bills and TDS are built in.
The e-invoice IRN is generated from the tax invoice in Mach ERP. Nobody re-types it on the portal.
The e-way bill is created from the delivery challan, on the same record.
Get started